Metal furring system
The term 'metal furring system', or MF system, refers to a non-structural metal attachment that is used to hold a finish material, often used as a technique for creating a seamless plaster internal finish with a void behind for the installation of services, with plasterboard fixed directly to the concealed metal furrings. It can be used as an alternative to traditional timber batten construction for walls and ceilings.
In metal-framed construction, the furring pieces are long, light gauge materials (usually 25 or 20 ga.) of various shapes, often used to hold insulation or other construction items between materials. Due to the light gauge, a certain amount of rigidity is provided by the bends that create the cross section shapes.
A ‘hat’-shaped bent metal is the most common type of metal furring. This is used to secure the outer layer of material where it would be difficult to insert attachments such as screws and nails.
A ‘z’ furring is attached to one surface at the bottom flange, accepting an outer layer of material to be attached to the other flange. This is often used in commercial and residential buildings as a spacer, allowing an existing wall surface to be insulated, or allowing horizontal electrical or plumbing components to be installed and covered with a finish material.
A variety of fastening methods can be used with a metal furring system. Screws are the most common and easiest, although when the furring strip is attached directly to concrete, masonry or structural steel, more specialised fasteners are used such as sleeve type anchors, course thread anchors, power actuated pin fasteners, and so on.
[edit] Related articles on Designing Buildings
Featured articles and news
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.